Power Distribution
Cable Laying & Termination
Underground and overhead cable laying, jointing, termination and testing.
Cable work is where an installation is most often let down, because a cable that is laid well and terminated badly still fails. We take the whole run: trenching, laying, jointing, termination and the tests that prove it before it is energised.
Scope of work

Who this is usually for
The buyers this kind of package normally comes from, not a client list.
How a Package Runs
Supply. Install. Test. Commission.
The four stages every package runs through. Nothing is handed over until it has been tested, commissioned and the results recorded.
Supply
Material procured to the specification issued with the order, and checked against it on delivery.
Installation
Setting out, foundations, erection and wiring by our own crews, worked to the issued drawings.
Testing
Insulation resistance, earth resistance and continuity, carried out before anything is energised.
Commissioning
Charging, load and operation checks, and handover with the test results recorded against the work.
On an ITC award
The material is issued by the client. We carry out installation, testing and commissioning, and record what we receive against the order.
More in Power Distribution
All servicesContact Us
Talk to us about the work
Call us, or send the details and we will come back with a quotation.
Naya Tola Hasanpur, Mahnar, Vaishali, Bihar 844506